How to Estimate a Roofing Job (Squares, Materials and Labor)
Updated by the EstimateDynamo team
Roofing jobs are high value and high risk. A clear process for measuring, pricing and documenting the scope keeps you profitable and keeps customers confident.
Measure in squares
Roofers price in squares, where one square is 100 square feet of roof surface. Measure each plane, account for pitch, and add the areas together.
Quantity worksheet: a 2,500 square foot roof
- Use the measured sloped roof surface, not the building's floor area. A total surface of 2,500 square feet is 2,500 / 100 = 25 roofing squares.
- For this example only, 12% shingle waste means 25 x 1.12 = 28 squares of shingles. Choose the allowance from the roof layout and your own takeoff, not a fixed rule for every roof.
- Keep installed labor at 25 squares unless your labor method explicitly prices waste. Material purchase quantities and installed quantities are not interchangeable.
- Convert squares to supplier packages using the specific product's coverage and round up to available package sizes. Do not assume every product uses the same number of bundles.
- Measure underlayment, flashing, valleys, starter and ridge cap separately. Confirm overlaps, layers, ventilation and manufacturer requirements.
Add waste
Cuts, valleys and hips create waste. A common allowance is around 10 percent, higher for complex roofs, but use your own experience.
Materials
- Shingles or other roofing
- Underlayment and ice and water shield
- Starter, ridge cap and flashing
- Vents, pipe boots and fasteners
- Drip edge
Labor and tear-off
Estimate crew hours for tear-off, deck repair, installation and cleanup. Include extra layers, steep pitch and access difficulty.
Disposal, permits and extras
Add dumpster or haul-off, permits and any safety equipment. Decide how rotted decking will be priced, for example a per-sheet rate stated up front.
Itemized roofing estimate example
These rates are illustrative, not supplier quotes or local market guidance. Replace them with your own costs and confirm whether overhead is already included. A 20% markup gives a 16.67% margin on the included costs, not a 20% margin. The downloadable PDF uses these same quantities and totals.
| Item | Calculation | Amount |
|---|---|---|
| Installed roofing labor | 25 squares x $120 | $3,000.00 |
| Shingles including waste | 28 squares x $110 | $3,080.00 |
| Underlayment and accessories | 1 job | $1,150.00 |
| Tear-off and disposal | 1 job | $650.00 |
| Permit allowance | 1 job | $150.00 |
| Included cost subtotal | $8,030.00 | |
| Markup | 20% of included cost | $1,606.00 |
| Customer price before tax | $9,636.00 |
Write assumptions before sending the estimate
For this sample, assume one existing layer, a measured 25-square roof, the specified material, site protection and cleanup. Name the shingle product, underlayment, flashing and ventilation work. Describe workmanship and manufacturer warranties separately.
The $150 permit figure is an allowance, not a confirmed fee. Identify who confirms the actual amount and how differences are approved. Extra tear-off layers, decking, structural repairs, gutters and interior damage need separate scope and pricing. Record a decking replacement unit price and approval process before concealed damage is uncovered.
Exclusions and warranty
List what is not included, such as structural repairs, gutters or interior damage, and describe the workmanship and manufacturer warranties.
Put it into practice
Use your own rates, see live totals and download a professional PDF. No account needed.
Open the roofing estimate calculatorFrequently asked questions
What is a roofing square?
A square is 100 square feet of roof surface, the standard unit for roofing materials and pricing.
How do I price rotted decking?
State a per-sheet rate on the estimate for any decking that must be replaced once the old roof is removed.